manufacturing
Energy, water and waste for manufacturers
For manufacturers, the charges beyond the unit rate, such as agreed capacity, network costs and how a contract passes through price changes, decide a large share of the bill. That applies whether you run a food and drink plant, a bakery or a paint-spraying and finishing business. Eligible GB manufacturers can also apply to the British Industrial Competitiveness Scheme until 11:59pm on 30 November 2026.
- Pass-through costs compared like for like
- Half-hourly data and agreed capacity checked
- Climate Change Agreement and BICS eligibility pointers
What we check
Process loads
Ovens, spray booths, curing and drying, compressors, extraction, chillers and process heat all set how and when you use energy. We compare quotes on that real pattern, across every shift.
Food and drink producers and bakeries
Cooking, baking, chilling, freezing and washing run long hours, and production often starts before dawn. Gas for ovens and process heat can be as large a cost as electricity.
Paint-spraying and finishing
Spray booths, curing ovens, compressors and extraction draw heavy loads in bursts. Booth heating is often on gas, with large electricity demand for fans and air.
Half-hourly data and agreed capacity
Larger supplies are metered half-hourly. Agreed supply capacity is paid every month whether used or not, so we check it against the peak demand your site actually draws.
Pass-through costs
Network, policy and balancing charges compared on the same basis across suppliers, so you see what is fixed and what can move.
Fixed, flexible or part-fixed
Buying matched to your volume and how much price risk the business wants to carry.
Climate Change Agreements
Businesses in eligible sectors that sign an agreement and meet their targets pay a much reduced Climate Change Levy. It is worth checking whether your sector and site could qualify.
BICS
The scheme can exempt eligible manufacturers from Renewables Obligation and Feed-in Tariff costs from April 2027 and Capacity Market costs from October 2027, subject to legislation. Check your SIC and HS codes against the published lists.
Trade effluent
For food and drink producers, wastewater from production is charged on its volume and strength. We check how it is charged and compare water retailers where you can switch.
More than one site?
We put every site's meters on one register, line up the end dates and tender the portfolio at once, with the same pass-through terms across every site.
How we are paid
At Business Savings Guru, we believe customers should understand how their energy broker is paid. Our commission is clearly disclosed on the energy contract you sign, so you know how BSG is remunerated before you commit. How broker fees work
Questions we are asked
What is a pass-through contract?
What is a trade effluent charge?
Do manufacturers qualify for BICS?
Read next
- BICS explained: who qualifies for the British Industrial Competitiveness Scheme and what it could saveBICS exempts eligible GB manufacturers from RO and FiT costs from April 2027 and Capacity Market costs from October 2027. Applications close 30 November 2026.
- Climate Change Levy rates 2001 to 2027CCL is 0.801p/kWh on business electricity and gas from 1 April 2026, rising to 0.827p from 1 April 2027. Every main rate since 2001, from HMRC sources.
- Fixed or flexible: a guide for large energy usersFixed or flexible business energy? How fully fixed, pass-through and flexible contracts work for large UK users, and how to choose by risk appetite.
