manufacturing

Energy, water and waste for manufacturers

For manufacturers, the charges beyond the unit rate, such as agreed capacity, network costs and how a contract passes through price changes, decide a large share of the bill. That applies whether you run a food and drink plant, a bakery or a paint-spraying and finishing business. Eligible GB manufacturers can also apply to the British Industrial Competitiveness Scheme until 11:59pm on 30 November 2026.

  • Pass-through costs compared like for like
  • Half-hourly data and agreed capacity checked
  • Climate Change Agreement and BICS eligibility pointers

What we check

  • Process loads

    Ovens, spray booths, curing and drying, compressors, extraction, chillers and process heat all set how and when you use energy. We compare quotes on that real pattern, across every shift.

  • Food and drink producers and bakeries

    Cooking, baking, chilling, freezing and washing run long hours, and production often starts before dawn. Gas for ovens and process heat can be as large a cost as electricity.

  • Paint-spraying and finishing

    Spray booths, curing ovens, compressors and extraction draw heavy loads in bursts. Booth heating is often on gas, with large electricity demand for fans and air.

  • Half-hourly data and agreed capacity

    Larger supplies are metered half-hourly. Agreed supply capacity is paid every month whether used or not, so we check it against the peak demand your site actually draws.

  • Pass-through costs

    Network, policy and balancing charges compared on the same basis across suppliers, so you see what is fixed and what can move.

  • Fixed, flexible or part-fixed

    Buying matched to your volume and how much price risk the business wants to carry.

  • Climate Change Agreements

    Businesses in eligible sectors that sign an agreement and meet their targets pay a much reduced Climate Change Levy. It is worth checking whether your sector and site could qualify.

  • BICS

    The scheme can exempt eligible manufacturers from Renewables Obligation and Feed-in Tariff costs from April 2027 and Capacity Market costs from October 2027, subject to legislation. Check your SIC and HS codes against the published lists.

  • Trade effluent

    For food and drink producers, wastewater from production is charged on its volume and strength. We check how it is charged and compare water retailers where you can switch.

More than one site?

We put every site's meters on one register, line up the end dates and tender the portfolio at once, with the same pass-through terms across every site.

How we are paid

At Business Savings Guru, we believe customers should understand how their energy broker is paid. Our commission is clearly disclosed on the energy contract you sign, so you know how BSG is remunerated before you commit. How broker fees work

Questions we are asked

What is a pass-through contract?
One where some charges, such as network and policy costs, are passed on to you at cost rather than fixed in the price. It can be cheaper, but the bill can move during the contract.
What is a trade effluent charge?
It is what a water company charges to treat wastewater from a business process, as opposed to ordinary sewage. It is usually worked out from the volume and strength of what you discharge.
Do manufacturers qualify for BICS?
It depends on your SIC and HS codes, which must be on the government's published lists. Check your codes before the 30 November 2026 deadline.